ESS High Ramp Rate Chamber

Environmental Stress Screening (ESS) chambers simulates stressful environment through rapid thermal cycling to determine the specimen’s failure rate in a shorter testing period. It not only helps manufacturer to develop a better product with least infant mortality rate but also considerably decreases their product development time. CME’s ESS chamber has ramp rate of 20°c/min with humidity range in between 10% to 98% RH forming a highly stressful environment in its test space to conduct wide range of testing procedures. The chamber is widely popular among electronics & electrical industries who relies on our chamber to identify failure risks of their new offerings which are in development stage.

VibationTester-specs 1

 FeaturesBenefits.
Construction
  • A mono block construction that comprises all systems necessary for operation. Outer material is primed and phosphate. Off white 7035 Epoxy based Electrostatic powder coating for a good aesthetic look and have high wear resistance. The 2mm thick cold rolled mild steel for all panels and 3mm thick cold rolled mild steel for all frames and chassis mounted on 4” heavy duty castor wheels ensuring easy mobility.
  • Durable construction .
Test Space
  • Pre-polished stainless steel with high gloss brush finish with reinforced bottom floor will be provided to withstand a distributed load of 500Kg/m2. All seams are TIG welded ensuring a vapor tight enclosure. Double continuous seal rings of silicone rubber is mounted on a thermal breaker strip to ensure complete sealing and zero conduction form the test space to the exterior.
  • Non corrosive and long lasting
  • Can accommodate various size of specimen
  • Offer high wear resistant.
Test Space Conditioning
  • The air circulation inside the test space is close to laminar flow ensuring uniform conditioning. Only the co-axial fan blades are exposed in the conditioning plenum which will be covered with a removable sheet for ease of maintenance.
  • Ensure uniform condition of specimen reflecting real world scenario.
Refrigeration System
  • High capacity ultra-low temperature hermetic compressor mounted on anti-vibration pads. Cascade refrigeration system with a high efficiency BPHE is provided. A water cooled condenser is provided with BPHE along with chiller. Hot gas bypass systems is used for protection against No-Load condition and superior stability and control in temperature. Oil return system is used for protection against oil migration from the compressor. Eco friendly Non-CFC refrigerants like R- 404a and R-23 are used.
  • Higher refrigeration efficiency for prolonged duration.
De-Humidification
  • Refrigeration based de-humidification coils are used. The desired level of lower humidity is achieved by maintaining the precise dew point temperature. The output is automatically activated based on the set point as well as in ramp up mode after a low temperature cycle.
  • Efficient climate control for optimum testing.
Humidification

ESS High Ramp Rate Chamber

  • A low-pressure droplet free vapor boiler using direct vaporization system is used. Reservoir is provided at the side of the chamber with PU tube quick connector and water level is automatically controlled through a water-in solenoid valve.

  • Efficient to conduct wide range of testing conditions

Description

Specification

Test Area

125L (500W x 500D x 500H) mm

Temperature Range

-70°C to 200°C

Temperature distribution

± 1°C within entire volume of chamber

Temperature Gradient

0.5°C to 1.5°C

Rate of Change (Heating)

20°C/Min with aluminium load of 50Kg and thermal load of 1KW. 20oC/Min is linear throughout the temperature range from ambient temperature to 200°C.

Rate of Change (Cooling)

20°C/Min with aluminium load of 50Kg and thermal load of 1KW. 5oC/Min is linear throughout the temperature range from ambient temperature to -70°C

Climate working range (with humidity control function)

10°C to 90°C

Temperature constancy in the climate working range

± 0.5°C

Humidity Range

10% to 98% RH

Humidity Fluctuation

±2% RH

Electrical power requirement

415V AC (± 10%), 3 Phase, 50 Hz ± 2 Hz.

Dew point temperature Range

4°C to 95°C

Temperature Monitoring & Control

Temperature sensor feed input to PID Controller to control SSR fired heaters and compressor output.

Venue: Pragati Maidan, New Delhi, India | Date: September 14-16 2017 | Our Booth No.: 1045
Product on Display: Climatic Chamber, Benchtop Chamber, Salt Spray